Mukharror, D. A. (2026) “PROCESS HAZARD SCENARIO COMPLETENESS AS A KEY RESULT INDICATOR FOR HAZOP STUDY QUALITY – THREE PHASE SEPARATOR CASE”, Journal of Energy and Safety Technology (JEST), 9(1), pp. 36–46. doi: 10.11113/jest.v9.227.